久久久亚洲精品男人的天堂_久久久日韩精品一区二区_久久久亚洲欧洲日产国产成人_91精品一区二区三区综合在线爱_国产三级精品一区二区三区_亚洲人成a在线网站_日韩精品欧美综合自拍偷_国产手机在线91精品观看_国产中老年妇女精品_亚洲日韩国产二区无码

Information
Hot
Contact us
Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
Fax: 021-69024199
Contact: Mr.Peng 
Mobile: 15021113195
Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
http://www.electroquote.com/

 

Hunan Peng bathroom safe choice
Your location:Home>>industry

The capacity selection of the transformer should be reasonable

Release date:2018-12-20 17:13:54

If the capacity of the transformer is too large, it will not only increase the initial investment, but also make the transformer run at no load or light load for a long time, so that the proportion of no-load loss increases, the power factor decreases, and the network loss increases. This operation is neither economical nor reasonable. If the transformer capacity is too small, it will overload the transformer for a long time and damage the equipment. Therefore, the rated capacity of the transformer should be selected according to the needs of the electrical load, and should not be too large or too small.


Article keywords:
QR code